top of page

Roadway Work at Clubhouse is complete

One of CenClub’s more significant capital projects has been completed. According to CenClub, the roadway leading to the back of the Clubhouse is now open for vehicle traffic.


A speed-table crosswalk has been installed near the new pickleball courts to offer a safer passage to these additional facilities.


The speed-table crosswalk is still under construction and will be opened to pedestrians as soon as it is completed.


This is just one of many significant capital improvement projects undertaken by CenClub since taking over ownership of various buildings and facilities several years ago. Among them was the complete replacement of windows on the Clubhouse, addressing years of leak problems.


Residents are now able to park in the back parking areas behind the Clubhouse.

Recent Posts

See All

Village reacts to looming condo crisis

Last month’s CVE Reporter front page story detailing a lack of participation on building boards has sparked a flood of discussion and reaction across the village. “It is time for CVE to restructure it

Half of potential voters sit out election

The number of people voting in last month’s village elections, while more than the previous year, represented about half of the number of people that could have cast a ballot. Of the 414 COOCVE direct

2024 Election Results

CenClub Board of Directors 2 Positions Available Serving  3 Year Term Candidate                   Votes Mike Rosenzweig        94        Winner Sheila Pascar               88        Winner Susan Dove 

bottom of page